Everyone that wants to produce its own electricity, must have a 'Sibelga Certificate'. This certificate:

  • - gives you the right to connect your installation to the distribution network.
  • - is a required document to access the green certificates.

We only need some documents.
Sibelga will not control your installation on site. This certificate is free of charge.

Required bidirectional meter

The bidirectional meter is an electronic meter, installed by Sibelga. It measures both your electricity consumption and your injection into the distribution network. Read how to get it .